![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Foundation going in |
Foundation going in |
![]() |
![]() |
The Slab is Poured |
The Slab is Poured |
![]() |
![]() |
Up Go the Studs |
Up Go the Sides and Roof |
![]() |
![]() |
Up Go the Sides and Roof |
Up Go the Sides and Roof |
![]() |
![]() |
Up Go the Sides and Roof |
All the Sides |
![]() |
|
Electrical Going In |
Inside Walls |
![]() |
![]() |
Brick is Up |
|
![]() |
![]() |
![]() |
![]() |
Electrical and Heating and Air Going In |
Painted Walls |
![]() |
![]() |
Our Builders |
Storage Room |
![]() |
![]() |
Pantry |
Kitchen |
![]() |
|
Director's Area |